Construction works of 220/110/35 kW substation in the territory of Thermal Power Plant

After the implementation of the following construction works Yerevan Thermal Power Plant will obtain a 220 kW substation, which will lead to reduction of equipment failure frequency, increase trustworthiness and productivity of the substation work, as well as will enable transmission of the electricity to the system produced by steam-driven turbine.

 

  1. Earth works

  2. Preparation of a monolith reinforced concrete basis

  3. Installation of reinforced basis ready for refilling

  4. Construction of 220/110 kW substation control building

  5. Construction of 110/35 kW substation control building

  6. Construction of an internal drainage system for the elimination of surface waters

  7. Installation of cable channels

  8. Construction of concrete roads in the territory of the substation

  9. Shifting works of 110 and 35 kW air lines